THE PROJECT
To design and manufacture an automated valve operating system for a remote eight megawatt hydro power station at Loch Sloy in the Highlands.
THE PROBLEM
The existing system was a hand operated arrangement requiring operators to travel up the hillside to the valve house by off-road vehicle to physically open or close the valve.
DESIGN BRIEF
-
Eliminate operator input.
-
Facilitate remote control operation.
-
A unitised construction is required to simplify installation and achieve a demanding commissioning programme.
THE SOLUTION
-
Design a system using a motor driven pump unit.
-
A suitable control system incorporating alarms for remote monitoring of system status.
-
Integrate system in to bespoke hydraulic circuit manifold assembly
THE OUTCOME
-
Client no longer has to make the long journey to site to operate the valve; the new hydraulic system is operated from central control.
-
Environmental concerns have been eliminated with the new leak-free system.
-
New system shall provide many years of trouble free operation.
-
The equipment was of course completed for the scheduled Helicopter delivery.